Previous chapter:
Chapter 77 - 72 Xu Sanye’s Conditions
Next chapter:
Chapter 79 - 72 Xu Sanye’s Conditions_3
PREVIEW
... the workers are working overtime to remove rust.
The supports for the floating bridge at Riverside Pier have already been cast, the required iron float boxes for setting up the bridge have all been made, and the six anti-collision piles produced by the cooperative manufacturer have all been delivered...
Boat 001 has been launched, and boat 002 was fitted with a powerful new engine five days ago, capable of reaching a top speed of 18 knots.
It would have been better to bui ...
YOU MAY ALSO LIKE