MTL - Invincible Divine Dragon’s Cultivation System
Chapter 3544 A thousand years at a glance! The death of the Zulong leader!
With an idea of building a purebred dragon army in his mind, Wang Xian immediately prepared to act.
He called Guan Shuqing and the other girls, and Wang Xian told them about the situation.
After all, this time they are going to retreat for at least five hundred years. They haven't been separated for so long!
Wang Xian's age is not 100 years old yet!
Here in the open continent, they still belong to the children who have not been weaned!
This time it will take such a long time, so naturally I have to talk about it!
However, this retreat does not require him to practice all the time, as long as he is there and watching.
You can move around, but you can't leave too far!
Guan Shuqing and the girls naturally didn't have any opinion, but they wanted to stay with him.
This kind of thing is not a big problem.
In the next time, Wang Xian sent the heavenly formation and began to arrange the teleportation formation.
A teleportation array from the Tianheng River to the Demon Bone Land, the Plasma Land!
Because the distance is too far, at least dozens of transmission arrays need to be deployed for transit, and it takes three to four years to deploy.
Wang Xian did not wait for him to set up the teleportation formation, and took a group of girls to fly toward the land of the devil bone!
When they arrived at the blood plasma land in the land of the devil bones, Wang Xian took them to the underground location, and then the branches of the ancestral tree leaned under and began to condense the fruit of blood refining!
Guan Shuqing and their girls started to build their surroundings.
It didn't take long for them to build a warm little palace here!
On the top of the palace, the Water Touch King lay there silently, acting as a guardian monster!
Those who dare to build a palace in the Plasma Land are the only ones including Wang Xian!
Even the spirit demon kings dare not be so presumptuous in the land of plasma!
But Wang Xian has no scruples!
Even the land of the devil bones may have a real master of the universe!
Wang Xian's own strength, coupled with the Water Touch King, can completely resist the real master of the universe.
This is not Wang Xian's own guess, but what the Water Touch King said.
After all, she was once a star behemoth at the real dominating level of the universe!
Wang Xian, Five Elements Great Mill, Wu Shi Sheng Wing, Tai Chi Dragon Disk, Ghost Ghost Clone, Lingling, and Water Touch King, too many cards are too terrifying!
Next, Wang Xian and the others settled in the Plasma Land!
The fruit of refining blood can be born more than one every six months.
In the vicissitudes of life, time flies quickly, Wang Xian and the others have entertainment and group repairs every day.
As for what is called group repair?
Double repair, understand?
Wang Xian and the others are ready to ask for some little dragons after they have risen to the realm of cosmic dominance!
Time passed quickly in the universe, and the interior of the Kaitian Desolate Continent fell into a short period of calm!
The battle between Dragon Palace and Hundred Cities Alliance has ended.
In the war between the Ancestral Dragon and the Sacred Dragon, apart from the fights between some disciples, there are very few battles at the dominating level of the universe!
Five hundred years passed quickly, and the blood refining fruits in Wang Xian's hands had accumulated to nearly a thousand!
But Wang Xian did not stop.
Because for the time being, there is nothing wrong with Dragon Palace.
The members of the Dragon Palace also stepped into the open land and began to experience.
Most of them have entered the land of mountains and seas, and the ocean is the ultimate belonging of the Shenlong clan.
The former Shenlong clan occupied the Shenlong Island in the land of mountains and seas. No one knows what the current Shenlong Island is.
Five hundred years later, Wang Xian has not stopped.
At a glance, a thousand years, soon, a thousand years have passed!
"Hahaha, Zulong King, I am finally going to kill you, I am finally going to kill you!"
At the same time, the sound of wild laughter sounded on the beach on the edge of the ocean in the land of mountains and seas.
A sacred dragon of light was suspended in the sky, and a dazzling dragon ball was shining around him.
Beside the dragon ball, there is a pair of terrifying bright dragon eyes!
Not only that, beside the dragon ball and the two long eyes, there is a book, a book of light.
It says a book of taboos!
Beside the book of taboos, there is also Bright Peak.
Every treasure contains energy that makes the world terrifying!
Each piece is an innate treasure level existence.
The four innate treasures are suspended around the holy dragon king, making its power and power extremely shocking!
There were five corpses in the lower position, each of which was a purebred dragon.
Two bright dragons, one earth dragon, one golden dragon, and one fire dragon are located in the center of the five dragon corpses, and there is also a huge dragon!
Water dragon!
The leader of the Zulong line!
At this moment, he was very weak, with brutal wounds all over his body!
"If it weren't for me to be severely injured, how could you be beheaded by a running dog and contaminate the blood of Shenlong!"
Chief Zulong said with a full face.
He was unwilling to die by a running dog!
"The running dog? Looking for death, I will lay your bones in my Dragon King Palace in the future, and I will trample you under my feet forever!"
When the Holy Dragon King heard him, he roared furiously!
"Hahaha, a running dog is a running dog. I have forgotten the glory of the ancestors. Although I will die today, the blood of my dragon will never be covered in dust. There will be dragons in the future. I will kill you and wash your running dog. The pollution of Shenlong blood!"
Chief Zulong roared with a frantic smile on his face.
He firmly believes that the glory of the Shenlong line will finally come!
"You talk too much nonsense, die for this king!"
The Holy Dragon King listened to the words of the leader of the ancestral dragon, his eyes were full of violent, the dragon claws waved, and the dragon ball above his head directly attacked the leader of the ancestor dragon.
Chief Zulong watched this attack indifferently and quickly sent out a message.
"boom!"
With a heavy blow, the vitality of the Zulong leader slowly disappeared!
A generation of ancestral dragon leaders, the ancestor dragon leader who has great ambition and inherited the will of the dragon, has fallen!
This represents the disappearance of an era of Shenlong.
Represents the line of Shenlong, the death of a faith!
"Hahaha, the line of Shenlong, the king is respected, the ancestral dragon king, die!"
The Holy Dragon King looked at the corpse below and couldn't help laughing wildly.
Finally, he finally wiped out Zulong!
In the future, the line of Shenlong will not be his opponent!
As for the Dragon Palace, the Dragon King, can it be compared with the brilliant Zulong King?
The leader of the Ancestral Dragon family was killed. Naturally, the Holy Dragon King will not conceal this news!
And soon, the photo of the corpse of the leader Zulong was sent to the Universe Brain.
On this day, Wanlong roared!
Countless dragons shed tears, and countless disciples of the dragons screamed for them!
Roar for it!
They never thought that their leader would be beheaded by the Holy Dragon King!
However, the ancestor dragon's line of cosmic dominance level combat power has received a temporary message from their ancestral leader!
There is only one message, not to avenge him, nor to destroy the line of the Holy Dragon.
But... watch out for the Phoenix!