Previous chapter:
Chapter 212 - 209. Risalis And The Romasi River
Next chapter:
Chapter 214 - 211. Digging
PREVIEW
... all barrier - maybe five to ten feet high in the path of the stream, which will make water gather upstream of it. Once the water has reached the height of the dam, it will begin flowing once again over the barrier, and it will resume the earlier path of the stream. However, now the water flowing over the dam will be falling to the ground with a lot of force, which we can use to turn a water wheel - hopefully the same one we are using to remove water from the mine shafts - which is why I designed ...
YOU MAY ALSO LIKE